Guide · Data collection

Arc-flash study data collection

Arc-flash study data collection is the phase where a technician or engineer walks the facility and records the nameplate data, settings and cable information for every significant piece of equipment in the system. It is where most of the field time in a study goes — commonly about half the total labor — and it decides whether the calculations that follow can be trusted, because SKM, ETAP and EasyPower only calculate what the model contains.

What data gets collected in the field

EquipmentData collected
TransformerskVA rating, primary and secondary voltage, impedance (%Z), manufacturer
Circuit breakersManufacturer, frame size, trip rating, settings (long-time, short-time, instantaneous), interrupting rating
FusesType, ampere rating, voltage rating, interrupting rating, manufacturer
Cables and conductorsSize (AWG or kcmil), conductor material, insulation type, length, conductors per phase
Switchgear and MCCsBus rating, voltage, manufacturer, section identification, protective device for each circuit
PanelboardsMain breaker rating, bus rating, voltage, phase configuration, panel name and location
MotorsHorsepower or kW, voltage, full-load amps, code letter (motors contribute to fault current)
Utility serviceAvailable fault current and X/R ratio at the service point, from the serving utility

How the phase runs

1. Start from the documents. The existing one-line diagram, panel schedules and any prior study define the intended system and the walkdown route. In many facilities these documents are years out of date, which is exactly what the field phase exists to correct.

2. Walk the facility. Each device in scope is located, opened where permitted, and recorded: nameplate values, protective device settings, conductor sizes and lengths. Photographs are taken as the record of what was seen.

3. Transcribe and reconcile. The field record is typed into the model, and checked against the drawings. This is where the disagreements surface: the breaker that was replaced and never redlined, the transformer with a different impedance than the drawing claims, the panel schedule that repeats a design that was never built. Each one needs an engineer's decision before it enters the model.

4. Build and calculate. Only now does the analysis software take over: short-circuit, coordination and incident-energy calculations under IEEE 1584, then labels and the stamped report.

Where it goes wrong

The failure modes are mundane, and they compound silently. A handwritten value is misread during transcription. A nameplate is corroded and the plausible-looking guess gets written down as fact — a 5 that could be a 6, an impedance that reads 4.5 or 5.5. A photo folder comes back with close-ups that cannot be tied to the equipment they belong to. None of these announce themselves; they flow into the model, the calculation, and eventually the label on the door. The defense is not care alone. It is a process where every value can be traced back to the evidence it was read from, and every uncertain value is visible as uncertain.

Three ways firms handle this phase

Clipboard and spreadsheet. Still the most common method. It costs nothing in software and everything in time: handwriting in the field, typing in the office, and no link between a value in the model and the evidence behind it.

Capture apps. The technician types or photographs each device in an app at the panel, so the record is structured from the start. This removes the handwriting step. It usually starts from a blank record, though — the existing drawings still have to be checked against the field separately.

Photo and drawing reconciliation. The field team sends the photographs it already takes, plus the existing drawings. The values are extracted from both, and the two sources are compared value by value. Conflicts are flagged for an engineer instead of being discovered during modelling — or never. This is the step ElecProof performs.

What ElecProof does: it reads your field photos and existing drawings and returns a verified draft model in 48 hours — every value linked to the photo or drawing it came from, photo-vs-drawing conflicts shown side by side, unreadable values flagged rather than guessed. What it does not do: calculate the study, replace SKM, ETAP or EasyPower, or stamp anything. Your PE reviews and seals the study. See what a study costs and what ElecProof costs.

Questions, answered directly

What data is collected for an arc-flash study?

Nameplate and settings data for every significant device: transformer kVA, voltages and impedance; breaker frame, trip rating and settings; fuse type and ampere rating; cable size, material and length; panel schedules; motor horsepower and full-load amps; and the utility's available fault current. The existing one-line diagram and panel schedules are the starting documents, where they exist.

What software is used for arc-flash studies?

The short-circuit, coordination and arc-flash calculations are run in SKM PowerTools, ETAP or EasyPower, using the IEEE 1584 method. Those tools calculate from a model; the model is built from the data collected in the field. Data collection tools — clipboards, capture apps, or a service like ElecProof — work before the analysis software, not instead of it.

How long does data collection take?

It depends on the facility: a small commercial building can be walked in a day, while a large industrial site with hundreds of panels takes days of field time. The transcription and reconciliation that follow the walkdown usually take longer than the walkdown itself, especially when the drawings disagree with what is installed. Data collection is commonly about half the total labor in a study that takes 3 to 16 weeks overall.

What happens when the field data and the drawings disagree?

The disagreement has to be resolved by an engineer, value by value, before the model is built — a breaker replaced years ago with a different trip rating changes the study. ElecProof shows both values side by side, each linked to its source (the photo and the drawing), and flags the conflict for your reviewer. Nothing is averaged or silently overwritten.

Does ElecProof export to SKM or ETAP?

ElecProof delivers a verified draft model as a reviewable draft plus an Excel/CSV data pack with an import guide for SKM PowerTools, ETAP or EasyPower. It does not generate native SKM or ETAP project files, and it does not perform the calculations — your engineers run the study in their own software, and your PE stamps it.

Keep reading

ElecProof turns field photos and old drawings into a verified draft model for arc-flash studies — every value linked to its source, in 48 hours. Questions: hello@elecproof.tech.