Guide · Study cost
How Much Does an Arc-Flash Study Cost?
Most arc-flash studies cost between $6,000 and $15,000. A study for a mid-size facility averages $12,000 to $15,000. A small commercial building with a single service can run $3,500 to $6,000, and a large industrial site can exceed $50,000. The spread is not arbitrary: it is mostly the number of buses and panels, the condition of your existing drawings, and how much field data collection the study requires.
| Facility type | Typical scope | Typical study cost |
|---|---|---|
| Small commercial / light industrial | Single utility service, one transformer, roughly 10–25 panels, no MCCs | $3,500 – $6,000 |
| Mid-size industrial or commercial | Multiple feeders, one to three MCCs, roughly 25–75 panels, 480V distribution | $6,000 – $15,000 |
| Large industrial or campus | Multiple substations, 75–200+ buses, some medium-voltage distribution | $15,000 – $50,000+ |
Typical US ranges for a study that includes data collection, modelling, short-circuit and coordination analysis, incident-energy calculations, labels and a stamped report. Many firms quote per bus; blended rates commonly land around $300 to $700 per bus once field work and engineering are combined.
What drives the price
System size. Every bus, panel, MCC and transformer in scope has to be recorded, modelled and calculated. A 20-panel building and a 200-bus plant are different studies, and the price follows the equipment count more than the square footage.
Documentation quality. A facility with a current one-line diagram and accurate panel schedules starts halfway to a model. A facility whose drawings stopped being updated years ago pays for the difference in field time: every value has to be verified against the installed equipment, and every disagreement between the drawing and the field has to be resolved before it can be modelled.
Field data collection. Someone walks the facility and records nameplate data, breaker settings, cable sizes and lengths for every device in scope. This phase is commonly about half the labor in the study, and it is the phase most sensitive to how the work is organised. How arc-flash data collection works.
Scope of deliverables. Short-circuit and coordination studies, equipment evaluation, labels printed and installed, and a PE-stamped report are each real work. Two quotes $10,000 apart can both be reasonable if they are not pricing the same scope.
How long the study takes
Most studies take 3 to 16 weeks from the field visit to the stamped report. The calculations themselves are fast once the model exists. The schedule is consumed earlier: scheduling the walkdown, transcribing field notes into the model, and chasing the values that were unreadable, missing, or in conflict with the drawings. That is the wait ElecProof is built to remove — a reviewable draft model, with every value linked to its source photo or drawing, within 48 hours of the field evidence arriving.
What ElecProof costs, separately
ElecProof is not the study, and it is not priced like one. It covers the data-collection and reconciliation step that your firm currently does by hand: $500 for a first study, handled white-glove, then $249, $549 or $1,199 a month depending on study volume. Your firm still performs the study in SKM, ETAP or EasyPower, and your PE still reviews and stamps it. Full detail on the pricing page.
Questions, answered directly
What does an arc-flash study cost on average?
Most arc-flash studies cost between $6,000 and $15,000. A study for a mid-size facility averages $12,000 to $15,000. Small single-service buildings can run $3,500 to $6,000, and large industrial sites with medium-voltage distribution can exceed $50,000.
How long does an arc-flash study take?
Most studies take 3 to 16 weeks from the field visit to the stamped report. The calculations are the fast part once the data is clean. Collecting, transcribing and reconciling the equipment data is what consumes the schedule, and it is also the largest block of field and office labor in the study.
Why do two quotes for the same facility differ so much?
Because scope differs. One proposal may include short-circuit and coordination studies, labels installed on equipment, and a full field walkdown; another may assume your drawings are current and model only part of the system. Compare what each quote includes — number of buses, field verification, labels, and who collects the data — before comparing the totals.
How often does an arc-flash study need to be redone?
NFPA 70E 130.5 requires the arc-flash risk assessment to be reviewed at intervals not exceeding five years, and sooner after a major change to the system — a replaced transformer, new switchgear, or a change in the utility's available fault current. A review is cheaper than a first study when the existing model and field data are still trustworthy.
What does ElecProof cost?
ElecProof does not perform or price the study — your engineering firm does that, and your PE stamps it. ElecProof covers the data-collection step before the study: $500 for a first study, handled white-glove, then $249 a month (Starter), $549 a month (Professional) or $1,199 a month (Scale) depending on study volume.